Recent Projects

Suncoast Waste Water Management (SWWM) has more than 14,000 Ozzi Kleen household sewerage treatment systems in operation and has completed hundreds of commercial wastewater treatment systems since 1983.

Below is a sample of our commercial wastewater treatment projects which demonstrate the innovation and diversity Ozzi Kleen systems offer.

 

Mining

 

Client: QCV

Ozzi Kleen Model: SC400A Transportable Sewage Treatment System

Loading: 80 000 litres/day

Location: Near Chinchilla QLD – 300 man camp

Features: Located on the QCLNG Gas Pipeline construction camp. QCV chose to use an Ozzi Kleen Sewage treatment system because it is transportable and produces a high class effluent that can be recycled on site.

 

 

 

 

Client: SANTOS

Ozzi Kleen Model: SK20 Skid mounted Sewage Treatment Systems x 3

Loading: 4000 litres/day per unit

Location: Cooper Basin QLD & SA

Features: These systems were designed for SANTOS to be easily transportable, robust and to produce effluent to be used for irrigation onsite.
 

Client: EXTRATA

Ozzi Kleen Model: SC600A Transportable Sewage Treatment System

Loading: 120 000 litres/day

Location: Ernest Henry Mine QLD

Features: The original 400 person Ozzi Kleen sewage treatment system was installed 16 years ago and this new SC600A was recently installed to cope with the increase in size of the accommodation village.
 



Client: SAXON Australia

Ozzi Kleen Model: SK20

Loading: 4000 litres/day per unit

Location: Cooper Basin and QLD QCG Gas Line Projects

Features: SAXON Australia have purchased in excess of 35 Ozzi Kleen transportable waste water treatment systems including SK10s, SK20s and SC50s for SANTOS and QCG (Queensland Coal Gas) projects.
 

Client: SAXON Australia

Ozzi Kleen Model: SK10

Loading: 2000 litres/day

Location: Cooper Basin

Features: This skid system has been designed to be fitted to a larger skid with other equipment to be used on a 10 person mobile drilling rig situation. These SAXON rigs are designed specifically for SANTOS.

 

 

Client: Oil Search

Ozzi Kleen Model: SC200

Loading: 40 000 litres/day

Location: Katubu - Papua New Guinea

Features:
All Ozzi Kleen containerised sewage treatment systems are designed in a standard 20 foot shipping container to be easily shipped to remote locations like the PNG Highlands. This containerised sewage treatment system is recycling the waste water from a fixed workers camp.

Client: Fortescue Mining Group - Port Hedland

Size: 165 EP

Loading: 33,000 litres/day

Location:
Located 1761km north of Perth via the North West Coastal Highway or 1660 km via the Great Northern Highway, Port Hedland is one of the major iron ore ports in Australia. With a population of over 15,000 it is an industrial centre totally committed to the extraction, processing and exporting of iron ore.

Features: This project involved an advanced secondary system to service a population of 670 office staff working for the mining giant FMG. The wastewater treatment system was installed during construction of the port facility and has been treating all wastewater during the construction period and continuing phases at the site.
 
Resorts
Name: Fitzroy Island Resort
Size: 530 EP
Loading: 106 000 litres/day
Location: Fitzroy Island is located just 4 kilometres from the mainland of Cairns in North Queensland. Fringed by the Great Barrier Reef, this island is a rare and unspoilt paradise that is 339 hectares in size, and covered in lush rainforest that descends spectacularly into crystal clear water.
Features: For this eco-sensitive island location, the treated effluent is reused for irrigation as per Queensland EPA guidelines.

Camp Reserves
  Name: Seaforth Camp Reserve
Size: 85 EP
Loading: 17,000 litres/day
Location: Situated 40km north of Mackay, Seaforth Camp Reserve is owned and operated by Mackay Regional Council. The reserve offers a large open, shaded area for all types of camping, and a range of recreational activities attracting campers to the location.
Features: Mackay Regional Council chose SWWM for our innovation & flexibility to supply a solution with the ability to handle large fluctuations in holiday seasons. 
 

Industrial & Fixed Mining Sites
  Name: Abbot Point Coal Terminal – Ports Corporation of Queensland
Size: 150 EP
Loading: 30,000 litres/day
Location: Situated about 25 kilometres north of Bowen, Abbot Point is home to Australia's most northerly coal port. It comprises a rail in-loading facility, coal handling and stockpile areas, and a single trestle jetty and conveyor connected to a berth and shiploader, located 2.75km off-shore.
Features: SWWM secured this project due to previous installations of successful treatment plant solutions for PCQ on earlier stages of the project.


Residential Developments
Name: Coral Cove
Size: 1500 EP
Loading: 300,000 litres/day
Location: Situated on the rocky foreshore and at the gateway to the Great Barrier Reef, Coral Cove Resort and Golf Club is just 14 km from Bundaberg on Queensland’s Coast. This prestigious resort village winds alongside a stunning 18hole golf course.
Features: The high quality effluent from this wastewater treatment plant is recycled for reuse as irrigation on the 18hole golf course. 
 
If you have a commercial project and would like more information, please complete this form and email back to info@ozzikleen.com or contact us.

Latest News Releases

Ozzi Kleen – Offering Products and Services for Using Recycled Waste Water 18-Jan-2012

Since 1983, Suncoast Waste Water Management has been producing waste water solutions to the masses. Ozzi Kleen is the company’s range of sewage and waste water treatment solutions. The compa..

Ozzi Kleen’s new look in Sewage Treatment and Waste Water Solutions 19-Dec-2011

Since the early 90s when the Trademark was first registered, Ozzi Kleen has been a recognised brand in the waste water industry. Now nearly two decades later the Ozzi Kleen name is stronger than ..

Request a Call Back

* Required











Captcha Image